This fixes a problem caused by the overlap of the connection-setup and
established-state phases of DCCP connections.
During connection setup, the client retransmits Confirm Feature-Negotiation
options until a response from the server signals that it can move from the
half-established PARTOPEN into the OPEN state, whereupon the connection is
fully established on both ends (RFC 4340, 8.1.5).
However, since the client may already send data while it is in the PARTOPEN
state, consequences arise for the Maximum Packet Size: the problem is that the
initial option overhead is much higher than for the subsequent established
phase, as it involves potentially many variable-length list-type options
(server-priority options, RFC 4340, 6.4).
Applying the standard MPS is insufficient here: especially with larger
payloads this can lead to annoying, counter-intuitive EMSGSIZE errors.
On the other hand, reducing the MPS available for the established phase by
the added initial overhead is highly wasteful and inefficient.
The solution chosen therefore is a two-phase strategy:
If the payload length of the DataAck in PARTOPEN is too large, an Ack is sent
to carry the options, and the feature-negotiation list is then flushed.
This means that the server gets two Acks for one Response. If both Acks get
lost, it is probably better to restart the connection anyway and devising yet
another special-case does not seem worth the extra complexity.
The result is a higher utilisation of the available packet space for the data
transmission phase (established state) of a connection.
The patch (over-)estimates the initial overhead to be 32*4 bytes -- commonly
seen values were around 90 bytes for initial feature-negotiation options.
It uses sizeof(u32) to mean "aligned units of 4 bytes".
For consistency, another use of 4-byte alignment is adapted.
Signed-off-by: Gerrit Renker <gerrit@erg.abdn.ac.uk>
Signed-off-by: David S. Miller <davem@davemloft.net>